top of page

DEPLOYABLE INFRASTRUCTURE

MICEBS

DFIS Integrated Solution: 12 x 20 foot container loads with no site leveling and services excavation required.

 

The system provides natural ventilation being off the ground with universally adaptable modules that are reconfigurable and reusable.

 

Compared with other container solutions the MICEBS solution is low cost and high life cycle affordability.

bottom of page